Recently, in Zambia, a set of L3B-2000 asphalt station was successfully installed and commissioned, and entered the stage of trial production. With the successful production of truckloads of asphalt, reliable raw materials were provided for Luen Road in Zambia.
Shantou L3B asphalt station with "high efficiency" "energy saving" "precision" "intelligent" product characteristics by the industry customers love. It adopts modular, block lap structure, the first and second dust removal is integrated above the drum, compact layout, small footprint, convenient installation, and shorten the installation cycle by 5-10 days. In terms of measurement, the double aggregate scale is used for parallel measurement, and high-precision rough and fine asphalt is weighed twice, with fast batching speed and more accurate measurement. In terms of screening, large-capacity mixing host, efficient maintenance-free vibrating screen and energy-efficient drying drum are equipped to fully ensure the screening effect on site, and the production capacity increases by 10 to 15% year-on-year. In terms of intelligent control, the basic version is configured with dual machine dual control and parallel instructions to realize the backup of system data. The upgraded version can realize online detection, remote monitoring, fault self-diagnosis, and the intelligent control effect is better.
It is reported that the Luen Highway is an important channel connecting major cities in Zambia. It passes through a number of ancient tribal settlements, colonial architectural sites and other areas of historical significance in Africa. It is not only a major artery for material transportation, but also a bridge for cultural exchange and integration. It carries the beautiful vision of the local people for national prosperity and national unity, and is an indispensable transportation artery on the African land.